Weather permitting, TDOT crews will be making bridge deck repairs on U.S. 127 over I-40 in Crossville at Exit 317, beginning at 8:00 p.m. CDT on Friday, May 29, 2020 and continuing until 6:00 a.m. CDT on Monday morning, June 1, 2020. In addition to temporary lane closures on the bridge, temporary lane closures will be required on I-40 in both directions beneath the bridge (one lane in each direction will remain open to traffic). On Monday morning at 6:00 a.m. CDT, all lanes will be reopened and traffic flow will be returned to normal on I-40 and on U.S. 127.
Bridge Repair Begins Friday Night At Exit 317 In Crossville
May 29, 2020 | 5:00 AM